LVP & Luxury Vinyl Flooring
We test your concrete slab with ASTM F2170 moisture probes before the first plank goes down — the step most installers skip, and the reason floors buckle.
Nine trade services. Mike Gizze personally executes each one — testing, installing, painting, and finishing — from the first site visit to the final walkthrough.
We test your concrete slab with ASTM F2170 moisture probes before the first plank goes down — the step most installers skip, and the reason floors buckle.
A 5–7 day active-HVAC acclimation protocol prevents the seasonal movement that cracks joints and voids manufacturer warranties in Florida's climate.
Precision floor flatness mapping before every tile layout prevents lippage and cracked grout — the two failure modes standard tile crews routinely ignore.
Mike executes every cut and coat personally using Sherwin-Williams product lines — no crew rotation, no finish coat applied over inadequate prep.
Every exterior job begins with 2100+ PSI pressure washing, hand-scraping chalky stucco, and caulking every joint — the three prep steps that determine whether paint lasts 3 years or 10.
Schluter-KERDI waterproofing membrane installation before every tile application — the only system that prevents moisture intrusion behind walls in Florida humidity.
Commercial-grade epoxy applied over diamond-ground concrete — not painted over dust, which is why our coatings don't peel within 18 months like big-box alternatives.
Complete texture removal followed by level-five skim-coat restoration — not a cover-up layer, a permanent surface ready for any paint finish.
Paver cleaning, re-sanding, and sealing at the joint level restores structural stability and prevents weed infiltration — the difference between surface treatment and real restoration.
Four non-negotiable steps that every project follows — in this order, without exception. This is why Beachside Flooring & Painting LLC installations do not fail.
ASTM F2170 in-slab relative humidity probe testing at every 1,000 sq ft, combined with floor flatness mapping to identify high spots, low spots, and moisture-risk zones before any material touches the floor.
When slab RH exceeds 75%, we apply LATICRETE® Vapor Ban ER epoxy moisture barrier or 6-mil vapor sheeting — the only methods that actually stop alkaline moisture from destroying adhesives and growing mold beneath your floor.
48-hour acclimation for vinyl. 5–7 days for hardwood. Active HVAC required throughout — the same temperature and humidity the floor will live in permanently, not a conditioned storage condition that changes on move-in day.
Mike personally executes baseboard mitering, door-jamb trimming, transition strip fitting, and the final walkthrough — every detail that separates a finished installation from a completed installation.
Every project shown here was completed personally by Mike Gizze. No stock photography, no stock interiors — actual job sites from Jensen Beach, Stuart, and Vero Beach.
LVP Installation — Vero Beach
Exterior Painting — Stuart
Bathroom Remodel — Jensen Beach
Real reviews from real homeowners in Jensen Beach, Stuart, Tradition, and across the Treasure Coast. Every quote below is from a verified Google reviewer.
"Mike found moisture in my slab before any other contractor mentioned it — and that was after I had already gotten four quotes. Every other guy was just ready to start laying floor. Mike pulled out a probe and showed me the numbers. I had no idea."
"We live in Tradition and needed our exterior repainted before the ARC inspection. Mike handled all the documentation, did the color submission, and the inspector approved it in one visit. He knew exactly what HOA compliance required before we even asked."
"The shower tile work Mike did in our master bath is something I show everyone who comes over. The Schluter edging is perfect, every grout joint is the same width, and the niche is level. I had a different contractor do the other bathroom years ago — there is no comparison."
Direct answers to the questions most contractors won't address until you've already signed a contract.
LVP flooring installation in Port Saint Lucie typically ranges from $4 to $9 per square foot installed, depending on material grade, subfloor condition, and moisture mitigation requirements. Beachside Flooring & Painting LLC conducts ASTM F2170 in-slab relative humidity testing before every installation — if moisture exceeds 75% RH, a LATICRETE® Vapor Ban ER epoxy barrier is required, which adds to the project cost but prevents adhesive delamination and mold growth that average over $10,000 to remediate. Homeowners with concrete slabs in high-water-table areas like St. Lucie County consistently encounter moisture issues that low-bid installers skip testing for.
No — waterproof LVP does not prevent mold from growing beneath the floor in Florida. While the vinyl surface blocks water from seeping down, it simultaneously traps moisture vapor rising from Florida's porous concrete slabs through the high water table, creating an alkaline environment under the floor that destroys adhesives and breeds mold. Beachside Flooring & Painting LLC measures in-slab relative humidity under ASTM F2170 before installation and applies a commercial-grade vapor barrier when moisture exceeds industry tolerances — the only method that actually prevents this failure mode.
Beachside Flooring & Painting LLC is a state-registered, active Florida LLC serving Port Saint Lucie's master-planned HOA communities, including Tradition and Esplanade, with exterior painting that includes ARC-ready color documentation and Sherwin-Williams Emerald applications. Owner Mike Gizze personally handles all prep — pressure washing at 2100+ PSI, hand-scraping chalky stucco, and caulking every joint before applying paint — meeting St. Lucie County's 2025 state-license requirements that replaced local Certificates of Competency. HOA homeowners who hire uncertified contractors after the July 2025 licensing change now face fines up to $5,000 for non-compliant renovation work.
Every project starts with Mike on-site — reading your slab, evaluating your surfaces, and giving you a straight answer on what the job actually requires. No estimate center. No account rep. The same person who answers this form is the person who will execute the work.